close_menu
Latest News

WSDOT continues its work on 520 bridge

2 of 2
Crews with WSDOT also installed temporary tolling equipment on the 520 bridge, and began demolition of the transit island next to the eastbound SR 520 ramps to and from Montlake Boulevard.  (WSDOT)
Crews with WSDOT also installed temporary tolling equipment on the 520 bridge, and began demolition of the transit island next to the eastbound SR 520 ramps to and from Montlake Boulevard. (WSDOT)
2 of 2